iDatam

IN AFRICA

ALBANIA

ARGENTINA

AUSTRALIA

AUSTRIA

AZERBAIJAN

B AND H

BANGLADESH

BELGIUM

BRAZIL

BULGARIA

CANADA

CHILE

CHINA

COLOMBIA

COSTA RICA

CROATIA

CYPRUS

CZECH

DENMARK

ECUADOR

EGYPT

EL SALVADOR

ESTONIA

FINLAND

FOR BACKUP AND STORAGE

FOR DATABASE

FOR EMAIL

FOR MEDIA STREAMING

FRANCE

GEORGIA

GERMANY

GREECE

GUATEMALA

HUNGARY

ICELAND

IN ASIA

IN AUSTRALIA

IN EUROPE

IN NORTH AMERICA

IN SOUTH AMERICA

INDIA

INDONESIA

IRELAND

ISRAEL

ITALY

JAPAN

KAZAKHSTAN

KENYA

KOSOVO

LATVIA

LIBYA

LITHUANIA

LUXEMBOURG

MALAYSIA

MALTA

MEXICO

MOLDOVA

MONTENEGRO

MOROCCO

NETHERLANDS

NEW ZEALAND

NIGERIA

NORWAY

PAKISTAN

PANAMA

PARAGUAY

PERU

PHILIPPINES

POLAND

PORTUGAL

QATAR

ROMANIA

RUSSIA

SAUDI ARABIA

SERBIA

SINGAPORE

SLOVAKIA

SLOVENIA

SOUTH AFRICA

SOUTH KOREA

SPAIN

SWEDEN

SWITZERLAND

TAIWAN

THAILAND

TUNISIA

TURKEY

UK

UKRAINE

UNITED ARAB EMIRATES

URUGUAY

USA

UZBEKISTAN

VIETNAM

Mid-Range

85 Idema Rd,

L3R1A9 Markham,

Ontario, Canada.

Data Center Speak to Sales
Cages

Bare Metal Servers

Private Cabinets

Partial Cabinets

Remote Hands

Public Cloud Servers

Cages

Footprints

Individual Servers

Feature

  • right-squared

    Customize

    Caged room that may be customized for clients with stringent security requirements. Our customers are free to install their equipment in our racks or in their own.

  • right-squared

    Reliable

    Bell, Allstream, Rogers, & Atria are the providers of our internet service. Upon request, dual cord power distribution is offered to clients. The Uptime Institute Tier II guidelines were followed in the architecture of the data center, which uses N+1 redundancy for active equipment.

  • right-squared

    Scalable

    Our flexible design allows our clients to easily add more single servers or complete racks as needed. We are able to ensure that clients can set up servers in under three days. Mid-Range also looks at new IT trends in order to prepare for the future. Our facility has been future-proofed, enabling our clients to supply liquid cooling to their servers as needed.

Efficient

A large number of high-efficiency technologies have been implemented to increase energy efficiency. We can lower the data center PUE (power usage effectiveness) to an expected 1.6 from the industry average of 2.6 by implementing the technologies listed below. Over the next ten years, we can reduce our utility bills by millions of dollars thanks to these innovations.
  • right-squared

    Free cooling

    When the outside ambient temperature drops below fifty degrees Fahrenheit, the data center can run in free cooling mode. As a result, we can lower the mechanical power needs during certain times by up to 75%.

  • right-squared

    Transformerless UPS Usage

    We may do away with the need for an input and output transformer by running the UPS system at 208V. We can cut the amount of IT power needed by up to 15% thanks to this.

  • right-squared

    High-efficiency UPSs

    By choosing environmentally friendly manufacturers and technology, we may increase UPS energy efficiency by up to 8%.

Amenties & Security Details

test-passed Amenties
Meet-Me-Room (MMR) ok--v1
test-passed Security
Onsite Security Staff ok--v1

Statistics & Power Details

Statistics--v1 Statistics
Network providers

4

Power--v1 Power
Total Critical Power

1 MW

Building & Compliance Details

Building--v1 Building
Whitespace expandable ok--v1
Total Whitespace

6,000 sq.f.

Year Operational

2008

Construction Type

Purpose-built

test-passed Compliance
Tier Design

Tier I

ISO27001 Certified ok--v1
SAS70 Type 2 Certified ok--v1

Services Details

service--v1 Services
Full Cabinets ok--v1
Partial Cabinets ok--v1
Shared Rackspace cancel
Cages ok--v1
Suites ok--v1
Build-to-Suit ok--v1
Footprints ok--v1
Remote Hands ok--v1

Pricing & Services

Please try our free quote tool or get in touch for a free consultation about your data center needs if you're searching for colocation,connectivity, or other services in Mid-Range, other data centers in Toronto, or run by Mid-Range.

Data Center

Nearest Data Centers

Distance Data Center Address
0.63 miles EdgeConneX Toronto - EDCTOR01 565 Gordon Baker Rd
1.08 miles Nuday TOR1 231 Amber St.
2.04 miles 371 Gough Road (YYZ10) 371 Gough Road
2.08 miles Rogers Toronto 550 Cochrane Dr
2.18 miles Priority Colo North 600 Cochrane Drive
2.27 miles Equinix TR5 8100 Warden Avenue
2.33 miles Centersquare - Toronto YYZ2 4175 14th Ave
2.41 miles Cologix TOR4-S 105 Clegg Rd
2.67 miles GRIP I.T. Data Center Toronto 30 Fulton Way
2.74 miles Cover-All Markham Centre Valleywood Drive